Logistics, Warehousing & PEB Infrastructure

Gujarat Industrial Logistics Hub

Pre-Engineered Building (PEB) Mega-Structure, Laser-Screed Flooring & Environmental Consents

The Gujarat Industrial Logistics Hub is a state-of-the-art 350,000 sq. ft. multi-client warehousing and distribution complex situated in the Dahej Petroleum, Chemicals and Petrochemicals Investment Region (PCPIR). Valoris Turnkey Solutions was commissioned to provide end-to-end execution, spanning clear-span Pre-Engineered Building (PEB) design, high-tolerance FM2 laser-screed industrial flooring, fire safety infrastructure, and complete statutory approvals.

Back to All Projects/Gujarat Industrial Logistics Hub
CompletedCAPEX: ₹85 Cr

Client / Enterprise

Private Enterprise

Supply Chain & Third-Party Logistics Operator

Project Location

Dahej PCPIR Region, Gujarat, India

Industrial Corridor

Commissioning Year

2025

Completed

Delivery Model

Fast-Track Turnkey EPC & Regulatory Clearance

Single-Point Accountability

Comprehensive Project Profile

Gujarat Industrial Logistics Hub

The Gujarat Industrial Logistics Hub is a state-of-the-art 350,000 sq. ft. multi-client warehousing and distribution complex situated in the Dahej Petroleum, Chemicals and Petrochemicals Investment Region (PCPIR). Valoris Turnkey Solutions was commissioned to provide end-to-end execution, spanning clear-span Pre-Engineered Building (PEB) design, high-tolerance FM2 laser-screed industrial flooring, fire safety infrastructure, and complete statutory approvals.

By coordinating structural steel fabrication with simultaneous land-use conversion (CLU) and State Pollution Control Board (SPCB) clearances, Valoris reduced standard project gestation by four months. The facility features automated dock levelers, heavy-duty racking provisions, insulated roofing systems, and rooftop solar synchronization.

Delivered ahead of schedule and fully under budget, the completed logistics hub now serves tier-1 multi-national manufacturing and supply chain enterprises operating across the western industrial freight corridor.

Engineering Challenge

Constructing a large-footprint clear-span structure over marine clay strata while securing complex coastal zone management and fire safety NOCs within a compressed 10-month delivery window.

Valoris Turnkey Solution

Executed deep dynamic ground compaction, utilized high-tensile 550 MPa structural steel for maximum clear-span efficiency, and leveraged our pre-established statutory relationships to expedite CLU, CTE, and Fire NOC clearances.

Execution Performance Metrics

Project CAPEX

₹85 Cr

Completed EPC Scope

Covered Area

350,000 Sq. Ft.

Grade-A Logistics Park

Floor Tolerance

FM2 Superflat

VNA Racking Ready

Project Duration

10 Months

Ahead of Schedule

Technical Scope Breakdown

On-Site Engineering & Execution Scope

Detailed breakdown of multi-disciplinary work packages executed under single-point Valoris management.

Work Package 01

Structural PEB & Insulated Cladding

High-tensile steel portal frame engineering, standing seam leak-proof roofing, continuous ridge ventilation, and energy-efficient insulated sandwich wall panels.

Key Scope Items:

  • 350,000 sq. ft. clear-span structural steel framework
  • Heavy-duty eave height of 12.5 meters with crane hooks
  • Integrated skylight polycarbonate daylighting panels
Work Package 02

FM2 Laser-Screed Industrial Flooring

High-tolerance, jointless concrete flooring with steel-fiber reinforcement, designed for 10-ton point axle loads and high-reach Very Narrow Aisle (VNA) forklifts.

Key Scope Items:

  • Abrasion-resistant floor hardener topping (dry-shake)
  • Heavy-duty floor load certification (100 kN/m² UDL)
  • Precision laser-level survey compliance report
Work Package 03

Fire Safety & Automated Loading Docks

Complete NBC/NFPA compliant fire suppression system, internal sprinkler grid, diesel pump room, and 24-bay hydraulic loading dock leveler network.

Key Scope Items:

  • 24 automated electro-hydraulic dock levelers & sectional doors
  • Ring hydrant network with dedicated water reservoir
  • Addressable fire alarm and smoke extraction system
Work Package 04

Statutory Licensing & Handover Dossier

Change of Land Use (CLU) approvals, GPCB Consent to Establish (CTE) & Consent to Operate (CTO), Fire Department NOC, and Factory Building License.

Key Scope Items:

  • Agricultural to Industrial CLU Conversion Order
  • GPCB Consent to Operate (CTO) operational permit
  • District Fire Authority final Fire Safety Certificate

Lifecycle Roadmap

Milestone Execution Timeline

Structured progression from DPR feasibility and civil engineering to testing and commercial energization.

Phase I · Month 1 – 2

Land Zoning, CLU & Geotechnical Prep

Land conversion approvals, deep dynamic soil compaction, boundary development, and SPCB CTE baseline filings.

CLU Order GrantedSoil Compaction VerifiedCTE Approved
Phase II · Month 3 – 5

Foundation & PEB Superstructure

Concrete stub foundations, 550 MPa structural steel erection, roof truss placement, and stormwater canal routing.

Structural Steel ErectedRoof Sheeting CompletePerimeter Secured
Phase III · Month 6 – 8

Laser-Screed Flooring & Fire Systems

FM2 superflat concrete floor laying, 24 dock levelers installation, fire hydrant ring piping, and high-bay LED wiring.

FM2 Floor CertifiedDock Levelers TestedFire Hydro-test Passed
Phase IV · Month 9 – 10

Inspection, CTO Licensing & Handover

Final GPCB verification, Fire Department inspection, building occupancy certificate, and commercial handover to client.

Fire NOC IssuedCTO Permit ReceivedCommercial Handover

Verification & Handover

Tangible Deliverables & Statutory Approvals

Comprehensive technical documentation, operational licenses, and verified compliance certificates.

Scope of Delivery

Technical Deliverables

  • 350,000 sq. ft. Grade-A pre-engineered building logistics warehouse
  • FM2 superflat laser-screed concrete floor with 10-ton point load tolerance
  • Network of 24 automated electro-hydraulic loading dock stations
  • GPCB Consent to Operate (CTO) industrial operating license
  • Chief Fire Officer (CFO) Final Fire Safety Certificate
  • Complete structural stability certification and as-built CAD pack

Statutory Clearances

  • Gujarat Industrial Development Authority Land Conversion (CLU)
  • Gujarat Pollution Control Board (GPCB) CTE & CTO
  • District Fire Emergency Service Final Safety NOC
  • Directorate of Industrial Safety & Health (DISH) Building Certificate

Strategic Commercial Impact

  • 100% facility leasing achieved within 30 days of completion due to Grade-A specifications.
  • 28% operational energy cost reduction via insulated roof design and natural daylighting panels.
  • Immediate eligibility for institutional logistics REIT investment and syndication.

Partner With Valoris

Ready to execute your industrial footprint with record-breaking efficiency? Connect with our technical desk to review your project blueprints.